Borehole Flow Reduction: Measure the Change Before Requesting Repairs
Document a reported flow reduction through consistent measurement points, units and operating times. Distinguish daily volume from flow, retain tank and meter limitations, and prepare a contractor evidence sheet without assigning a cause or choosing a repair prematurely.


